
L9282-85
Grade: L1
Introduction Date: 04/01/2018
Available Now: 326 feet
Approximate Supplier Lead Time: 3 weeks
Current Manufacturing Time is 8 Weeks.
Material Description: A pre-embossing process results in a regular break and visually uniform surface. A natural sheen and solid color make it a versatile article with a modern look. To clean, wipe down with a slightly damp cloth or dry dusting.
Click Link for Additional Information:
Corrected Leather
Share