7212-74
Grade: D
Cleaning Code: WS
Introduction Date: 10/01/2025
Fabric Content: 98% POLYPROPYLENE 2% POLYESTER
Horizontal Repeat: 25
Vertical Repeat: 2.75
Available Now: 100 yards
Approximate Supplier Lead Time: 9 weeks
Transitions Express-Quick Ship manufacturing time is approximately 2 Weeks for in stock fabrics applied to a Transitions Express-Quick Ship Style. Current Manufacturing Time is 8 Weeks for styles not in Transitions Express-Quick Ship.
Material Description: Drawing inspiration from menswear, a subtle herringbone with lots of texture. It reminds one of the perfect chameleon sport coat. It combines the performance of Revolution yarns with subtle beauty of boucle yarns.

Share