
8639-56
Grade: H
Cleaning Code: S
Introduction Date: 10/01/2023
Fabric Content: 100% POLYESTER
Width: 56
Durability: 66,000 DOUBLE RUBS
Available Now: 65 yards
Approximate Supplier Lead Time: 10 weeks
Transitions Express-Quick Ship manufacturing time is approximately 2 Weeks for in stock fabrics applied to a Transitions Express-Quick Ship Style. Current Manufacturing Time is 8 Weeks for styles not in Transitions Express-Quick Ship.
Material Description: A jacquard chenille solid accented with novelty boucle warp yarns. The piece dyed colors are presented in tonal variations employing maximum texture.
Share